return to How to Build and Run the GEK Gasifier
View
Here are the complete instructions for fabricating all components of the v3.0 and v3.5, and GEK gasifier system. These instructions assume you have the corresponding version of the kit and thus are in possession of the needed sheet metal, plumbing and accessory parts. If you are builidng your GEK from obtainium scrap tanks or you own inhouse cut sheetmetal, see here for the EXTREME DIY fork.
The GEK gasifier system consist of six vessels / components. You will build each of these separately, then bolt them together for the integrated unit. We encourage you to follow the order of instructions as presented, as this will prevent annoying critical path issues at the integration stage.
With that out of the way, let's get started. Please choose the GEK version you would like to fabricate.
Fabrication Instructions:
return to How to Build and Run the GEK Gasifier
Comments (0)
You don't have permission to comment on this page.